Service Upgrade 100A to 200A in Langley, BC
60A or 100A to 200A. The standard fix when adding an EV charger, heat pump, hot tub, or accessory dwelling. Permitted, code-compliant, BC Hydro-coordinated.
- Free Estimates
- Licensed & Insured
- Response Within 24hrs
- 5-Star Google Rating
A service upgrade increases the total amperage your home can pull from the BC Hydro line. Older Langley homes often have 60A or 100A service, which was fine for a 1980s house but is not enough once you add a Level 2 EV charger, a heat pump, an electric range, and modern lighting at the same time.
Upgrading to 200A is the standard fix. The job involves a new meter base, a new service entrance, a new panel, and BC Hydro coordination to disconnect and reconnect the line. We handle every step, including the permit and the inspection.
Every job includes
- Load calculation to confirm 200A is the right size for your plans
- New meter base and service entrance
- New 200A main panel (Eaton, Square D, or Siemens)
- BC Hydro coordination for disconnect and reconnect
- Permit pulled with Langley Township, inspection scheduled
- Bonding and grounding to current code
$3,800 to $6,500 typical
These are typical price ranges — exact pricing varies depending on your specific situation, and every service upgrade gets a written line-item quote before work starts. Cost depends on whether the meter location is moving, the run length to the new panel, and whether trenching to a detached garage is involved.
Do you need a permit?
Service upgrades require a Technical Safety BC electrical permit, a Langley Township building permit if the meter base relocates, and BC Hydro to schedule the disconnect and reconnect. We coordinate all three.
Frequently asked
- Not always. A 32A charger can often run on a 100A service. A 50A charger usually needs 200A, especially if you also have a heat pump or electric range. We run a load calculation before we quote either job.
- Most service upgrades are completed in a single day, with power off for 4 to 6 hours. BC Hydro reconnect happens the same day in most cases.
- Yes. The new meter base requires BC Hydro to swap the meter and reconnect the service. We schedule this for you and confirm the appointment.
- 150A is rare in residential. The standard sizes are 100A and 200A. If 100A is short of what you need, 200A is the move.
You may also need
Read before you decide
Practical articles on electrical service upgrade — costs, timelines, and what to expect in BC.
- Service Upgrades
100A to 200A Service Upgrade Cost in Langley (2026)
What a 100A to 200A residential service upgrade actually costs in Langley, what BC Hydro coordinates, and how to know if you really need 200A.
Read article - Service Upgrades
When You Actually Need a Service Upgrade (vs Just a Panel Upgrade)
Service upgrade and panel upgrade aren't the same job. One increases your home's total amperage. The other replaces the box. Here's how to tell which you need.
Read article - Service Upgrades
Service Upgrade Timeline: BC Hydro Disconnect to Reconnect (Langley Guide)
From quote to live 200A service in Langley, the day-by-day timeline including BC Hydro coordination, the disconnect appointment, install day, and the reconnect.
Read article
Electrical Service Upgrade across the Fraser Valley
We provide electrical service upgrade across our four primary service areas.
Ready for your electrical service upgrade?
Send us your project details and photos. We respond within 24 hours.



